Skip to content
infoloop

Manufacturing

Software for factories and plants, built around your shifts

You make things. We make the software that keeps track of it all: who turned up, what each machine is doing, what is left on the shelf, which order goes out today. We build it, then we look after it.

Factories run on more software every year

Several sites. Several shifts. Contract labor at the gate. An accounts package, a machine log and a few spreadsheets that matter more than anyone admits.

Plant managers are not short of software. They are short of software that agrees with itself. Hours live on paper or in a workbook two people understand. Orders, stock and job cards sit in three places. The report that matters gets built by hand every Monday.

The quotes for the big platforms come back priced for a company ten times your size, and half of what you would pay for does not apply to you. Or somebody built you something a few years ago and vanished, and now a small change takes weeks to get an answer on.

  • Hours that payroll can trust.
  • Orders, stock and jobs in one place.
  • Reports a plant manager will actually read.

Infoloop builds that software around your shift patterns and the way your supervisors already work, connects it to what you run, and stays to keep it running. One plant first, then the rest.

Measured results

Manufacturing problems we solve

We build and run software for the way a plant really works, not the way a brochure says it should.

  • Hours are still on paper or a spreadsheet

    Several sites, several shifts, contract labor. Payroll takes days every month and nobody quite believes the numbers. We clock people in across every shift and site and give payroll one clean file.

  • Orders, stock and jobs live in three places

    What is on order, what is on the shelf and what is on the floor never agree. We put them in one place and connect it to your accounts package and machine log, so a figure is typed once.

  • Machines fail with no warning

    Unplanned downtime eats the month. Maintenance software connected to the ERP flags a likely failure 10 to 14 days ahead, so the fix happens on your schedule, not the machine's.

  • Software nobody supports any more

    Somebody built it, handed over a folder and left. Every small change is a risk. We take it on, get it back under control and stay to run it, one safe change at a time.

Built around your shifts. Run by us.

Case studies

Measured results from plants like yours.

Choose a featured case study

$1.2M saved a year with predictive maintenance and a multi-plant ERP

Predictive maintenance and one ERP across three plants cut unplanned downtime 72% and saved a global machinery manufacturer $1.2M a year.

  • -72% unplanned downtime
  • $1.2M saved each year
  • 98% order fulfilment accuracy
  • -65% supplier delays

90% less timesheet admin across three manufacturing plants

OpsDeck went live across three plants in three weeks. Daily error flags stop missed punches before payroll, and timesheet admin fell 90%.

  • 90% less timesheet admin
  • 0 missed punches in payroll
  • 3 weeks to go live across sites

What working with Infoloop gets you

For plants that need software live quickly, without a day of lost production.

  • Live in weeks

    Planning in a week, most projects live in 4 to 8 weeks, one plant switched on at a time.

  • One price, agreed first

    What we build, when it lands and what it costs, in writing before anything starts.

  • Reports people read

    One screen with the first coffee: output against plan, machines down, people in.

  • Connects to what you run

    Accounts package, machine log, payroll. Typed once, everywhere it should be.

  • Run by us afterwards

    We watch it, fix faults to an agreed time, keep it patched, and report every month.

Trusted by plants that need it to just work

Built on the tools you already run and the platforms we know well.

  • Webflow
  • Shopify
  • Stripe
  • Slack
  • AWS
  • OpenAI
  • Anthropic
  • WordPress
  • Next.js
  • React
  • Node.js
  • Flutter
projects delivered
50+
projects delivered
countries
6
countries
uptime on software we run
99.9%
uptime on software we run
average client rating
4.8
average client rating

What our clients say

The difference is they did not leave. Every month we get a report, fixes and one clear next step.

Operations lead, manufacturer

Read the case study

Blogs and insights

FAQs

Questions plant managers ask us

Straight answers. If yours is not here, ask us on the call.

  • What will this cost us?

    One price for one agreed piece of work, so you know the number before we start. To get there we need a 30-minute call: how many sites, how many people on the books, what the shifts look like and what software you already use. Then we write down what we will build, in what order and by when, with the price next to it. Running it afterwards is a separate monthly fee, quoted at the same time. Anything you add while we build is priced and approved first.

  • Have you really done this for factories before?

    Yes. We built the hours and attendance software for a three-plant manufacturer, covering shifts, contract labor and the file payroll needs. It cut their timesheet paperwork by 90% and took three weeks. We also built maintenance software connected to a machinery maker's ERP, which saved $1.2M a year and cut unplanned downtime by 72%. That is the factory work we can point to, and we would rather say it plainly than hint at a longer list.

  • What happens once it is switched on?

    We look after it. We watch the software, mend faults within a time we agree with you, keep it patched and secure, and keep improving it as the plant changes. Every month you get a short report: what stayed up, what we fixed, what you asked for and what we think should come next. Software in a factory is not finished the day it goes live. That is the day it starts.

  • Will it work with the software we already have?

    Nearly always. Most factories already run something for the accounts, plus a machine log and a handful of spreadsheets. We do the joining-up, so a figure is typed in once instead of three times. If one of your tools has no sensible way of being connected, we say so straight away and suggest a simple import and export instead.

  • How long before it is running at all our sites?

    We switch on one plant at a time rather than everywhere at once. The first site takes the longest: that is where you find the shift pattern nobody mentioned. Later sites go quicker because the surprises are behind you. The dates are written down before we start and depend on how many sites and shift patterns you have and how much joining-up is needed.

  • Will we have to change how the plant works?

    No. Software that fights the way a plant really runs gets worked around within a fortnight, and then you are paying for something nobody uses. We build around your shift patterns, your contractor arrangements and the way your supervisors already write things down. Supervisors and operators get their hands on it while we are still building.

Tell us what goes wrong in your plant

Bring the thing that costs you days every month: sorting out hours, chasing a job through the factory, or software nobody supports. You will leave the call knowing what it would take to fix it.